Tuesday, December 20, 2016

Koteshwor-Kalanki road expansion delayed by a year

Blogger | 6:23 AM |
The proposed 800-metre underpass between Khasibazaar and Bafal Chowk is expected to complete in two years. The four-lane underpass, which is part of the Kathmandu Ring Road Improvement Project, will significantly ease traffic congestion at Kalanki Chowk, according to Ramesh Kumar Disti, the KRRIP engineer.A tunnel for the underpass is being dug at present. More than two dozen Chinese workers have been mobilised for the job. Once the underpass is completed, the vehicles driving between Swyambhu and Balkhu will not have to experience traffic jams at Kalanki intersection, Disti said.The underpass will be part of the 10.39 km Koteshwor-Kalanki road for which the China has pledged a grant of Rs 5.13 billion. - See more at: http://www.lightnepalvideo.com/videos/koteshwor-kalanki-road-expansion-delayed-by-a-year/#sthash.k3cze01i.dpuf
Share this article

0 comments:

Post a Comment

 
Copyright © 2015 TAJA KHABAR.COM
Distributed By My Blogger Themes | Template Design By BTDesigner